Available scope
Base cabinets, wall units, tall storage and appliance housings can be combined with an island or breakfast counter. Choose the cabinet fronts and finish from the project samples, with each component identified in the specification.
Before quotation
Share appliance dimensions, electrical and plumbing positions, and the storage you need. Door and drawer clearances and finished floor levels are checked before the production drawings are approved. Worktops, appliances and lighting are listed separately in the agreed scope.
| Item | What to clarify |
|---|---|
| Layout | Wall lengths, corners, ceiling height and circulation. |
| Cabinet construction | Board type, thickness, back panels, edge finish and exposed sides. |
| Fronts and finish | Finish sample, grain direction, handle style and visible joints. |
| Hardware | Hinge and runner model, drawer loads and storage fittings. |
| Scope boundaries | State whether worktops, appliances, plumbing, lighting and installation are included. |
Project stages
Share the brief
Send the location, approximate dimensions, photos or designer drawings.
Measure and review
We arrange an engineer visit and identify dimensions awaiting final site finishes.
Quote and approve
Agree items, materials, hardware, delivery and installation; review drawings and samples.
Make, install and inspect
Manufacture the approved items and review fit, operation and finish at handover.
Service questions
How much does a custom kitchen cost?
The quotation depends on the layout, cabinet specification, fronts, hardware and site work. A price per metre is only comparable when both offers define the same measuring method and inclusions. Send your approximate dimensions to start.
Can your engineer take the measurements?
Yes. We arrange engineer measurement visits for kitchen projects throughout Egypt. Share your city and site readiness so the visit and its terms can be agreed.
Can you manufacture my designer’s kitchen?
Yes. Send the drawings and appliance schedule. We review dimensions, materials and practical installation details before the production drawings are approved.



