Resolve the top closure detail
Full-height cabinetry needs measurements at several points because ceilings and floors may vary. Decide whether the top is usable storage or a closure panel. Review service routes and ventilation before closing the space, and plan how the upper compartments will be reached and maintained.
Compare the design options
Use these options to discuss the configuration that fits the room and its intended use. Review dimensions and details against the actual material and hardware selected in the drawing.
Floor-to-ceiling kitchen cabinets — decision worksheet
Scroll horizontally to see all columns.
| Option | When to consider it | What to check |
|---|---|---|
| Single tall cabinet | A continuous full-height arrangement. | Delivery access, front size and compatible hinges. |
| Separate upper units | High storage split into compartments. | Joint alignment and access to each level. |
| Top closure panel | Closing the gap without added storage. | Ceiling variation, fixing and finish of the closure. |
Details to send before quotation
Include clear site photos and any available drawings, then clarify the points below. This makes the quotation scope easier to review and helps identify changes before production approval.
- Measure ceiling levels at the ends and middle of the run.
- Locate ducts, pipes and nearby lighting.
- List items intended for high-level storage.
- Check doorway, stair or lift access for delivery.
Installation and handover checks
Inspect top closures and front alignment from a suitable distance. Open upper doors against ceilings and lighting, and confirm access to services that need maintenance.
| Item | What to clarify |
|---|---|
| Project file | Location, floor, site photos and dimensioned drawings with a revision date. |
| Quotation scope | Identify manufacture, delivery, lifting, installation and work requiring another contractor. |
| Approval | Agree the finish sample, production drawing and item schedule; record changes to price or timing. |
Common questions
Should cabinet doors touch the ceiling?
Not necessarily. The drawing should define clearances and closure panels according to site levels, opening movement and the fixing method.