WODIX / Outdoor timber decking

Outdoor timber decking

Plan outdoor timber decking with suitable material, substructure, drainage and maintenance access. Coordinate levels and fixing with the site engineer. Use this guide to review the design with your site engineer before approving manufacture.

Design illustration: wooden pergola

Review the substructure as well as the boards

Deck boards need coordinated support, water drainage and ventilation below. Specify exposure and material suitability together with doorway levels and drainage. On roofs and balconies, the responsible specialist must review waterproofing, loads and fixing; laying boards does not resolve an existing drainage or waterproofing defect.

Compare the design options

Use these options to discuss the configuration that fits the room and its intended use. Review dimensions and details against the actual material and hardware selected in the drawing.

Outdoor timber decking — decision worksheet

Scroll horizontally to see all columns.

Outdoor timber decking — decision worksheet
OptionWhen to consider itWhat to check
Deck on a separate substructureAn arrangement retaining space below boards.Levels, ventilation, support and drainage.
Deck over an existing surfaceAn installation needing substrate review.Waterproofing protection and clear drainage points.
Arrangement with access sectionsServices or drains requiring maintenance.Panel access and stability after replacement.

Details to send before quotation

Include clear site photos and any available drawings, then clarify the points below. This makes the quotation scope easier to review and helps identify changes before production approval.

  • Provide the site plan and doorway and drain levels.
  • Specify material, exposure and intended use.
  • Coordinate support, loads and waterproofing with the responsible engineer.
  • Define maintenance openings, edges and cleaning arrangements.

Installation and handover checks

Review supports, fixing, gaps and walking-edge details with the specialist. Keep drains accessible, test maintenance panels and retain care instructions for the specified material.

Your project specification checklist
ItemWhat to clarify
Project fileLocation, floor, site photos and dimensioned drawings with a revision date.
Quotation scopeIdentify manufacture, delivery, lifting, installation and work requiring another contractor.
ApprovalAgree the finish sample, production drawing and item schedule; record changes to price or timing.

Common questions

Does decking replace roof waterproofing?

No. Waterproofing and drainage require separate design and review. Coordinate the timber surface so it preserves the membrane and access to drains.

Technical references

From Tanta to all Egypt

Request a quotation for your project.

Send the required items, location and available drawings so we can review dimensions and specifications.

Contact us about your project

Send your drawings or reference images and the project location. We can arrange site measurements and prepare a quotation.